Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-CLD/B Seekarspitz










General information  
Place Obertauern 
resort ?? 
Region Salzburg 
Country   
Name of lift Seekarspitz 
Type 8-CLD/B 
Lift manufacturer Leitner 
Year of construction 2017 
Commissioning date 23/12/17 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1807 m
Height of mountain station 2203 m
Vertical rise 396 m
Route distance 1482 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 17 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2600 Pers/h
Travel time ?? min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system Leitner 
Power control system Leitner 
Number of drive 1 Stk
Drive power (Start) 794 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive direct drive 
Emergency drive hydraulic 
Traction of emergency drive hydrostatic 

cabins data  
Grip type LPA-L 
Cab manufacturer Leitner 
Cab model ?? 
Bubble colour neutral 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs 49 Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground 
Garage place mountain station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 8 months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 11/06/21
PHOTOS: ??

Lift-Statistics
11452 visit(s) since 25/11/17
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 18466
Place-ID: 81

https://www.seilbahntechnik.net/en/lifts/18466/datas.htm