Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD/B Kammerkör










General information  
Place Waidring 
resort 3 Laender Freizeit-Arena 
Region Tyrol 
Country   
Name of lift Kammerkör 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2014 
Commissioning date 2014 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1260 m
Height of mountain station 1660 m
Vertical rise 401 m
Route distance 1614 m
Horizontal length 1550,70 m
Average incline 25,81 %
Largest incline 74,07 %
Number of pillars 15 Stk
Greatest spanwidth 160 m
Max ground clearance 20 m
Trackwidth drive 6,10 m
Trackwidth line 6,10 m
Trackwidth return 6,10 m
Angle of wrap (drive wheel) 180 °
Drive altitude of site 1255 m
Maximum capacity 2400 Pers/h
Travel time 5,0 min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system Doppelmayr 
Power control system Doppelmayr 
Number of drive 1 Stk
Drive power (Start) 608 kW
Drive power (Operation) 476 kW
Brake power -480 kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type DT 108 
Cab manufacturer Doppelmayr 
Cab model 6E98/B 
Bubble colour neutral 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs 77 Stk
Cab distance 45 m
Cab interval ?? s
Garage type underground 
Garage place mountain station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope 3300 m
Total weight of haul rope ?? t
Haul rope diameter 47 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 6 months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Asset number (Trail map)

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 09/03/22
PHOTOS: ??

Lift-Statistics
19602 visit(s) since 02/11/14
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 17692
Place-ID: 6

https://www.seilbahntechnik.net/en/lifts/17692/datas.htm