Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD Tovière










General information  
Place Tignes 
resort Espace Killy 
Region Rhône-Alpes 
Country   
Name of lift Tovière 
Type 10-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2013 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 2092 m
Height of mountain station 2692 m
Vertical rise 600 m
Route distance 1782 m
Horizontal length 1653 m
Average incline 36,3 %
Largest incline 80,4 %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3300 Pers/h
Travel time 5 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 2 Stk
Drive power (Start) 1220 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type A108C 
Cab manufacturer CWA 
Cab model OMEGA IV-8 LWI 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 10 
Number of cabs 70 Stk
Cab distance 66 m
Cab interval 11 s
Garage type ground floor 
Garage place mountain station 
Garage direction forward 
Loading direction ?? 


rope data  
Rope manufacturer ArcelorMittal 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 50 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 05/11/23
PHOTOS: ??

Lift-Statistics
8769 visit(s) since 26/10/13
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 16987
Place-ID: 1227

https://www.seilbahntechnik.net/en/lifts/16987/datas.htm