Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD/B Centrální (CineStar Express)

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Loučná pod Klínovcem 
resort Klínovec ski area 
Region Ústecký kraj 
Country   
Name of lift Centrální (CineStar Express) 
Type 4-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2011 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 955 m
Height of mountain station 1243 m
Vertical rise 287,50 m
Route distance 1235,39 m
Horizontal length 1196,72 m
Average incline 24,02 %
Largest incline 53,36 %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,20 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 4,44 min
Driving speed line 5,00 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 380 kW
Drive power (Operation) 290 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 104 
Cab manufacturer Doppelmayr 
Cab model 4E98/B 
Bubble colour orange 
Seating Icolan 
Seat heater no 
Persons per cab
Number of cabs 89 Stk
Cab distance 30,00 m
Cab interval 6,00 s
Garage type ground floor 
Garage place valley station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope 2521,46 m
Total weight of haul rope ?? t
Haul rope diameter 38 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 25 %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 5 months
Seasontime winter 
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 03/02/23
PHOTOS: ??

Lift-Statistics
16222 visit(s) since 29/10/11
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 15453
Place-ID: 357

https://www.seilbahntechnik.net/en/lifts/15453/datas.htm