Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD/B Buková hora

Line
Line

Mountain Station
Mountain Station

Valley Station
Valley Station

General information  
Place Červená Voda 
resort ?? 
Region Pardubický kraj 
Country   
Name of lift Buková hora 
Type 4-CLD/B 
Lift manufacturer Leitner 
Year of construction 2010 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
the first Lift with seat-heating in Czech republic, from 2011 Chairs with Bubbles

geometric data  
Height of valley station 557 m
Height of mountain station 956,5 m
Vertical rise 399,5 m
Route distance 1672 m
Horizontal length 1614 m
Average incline 24 %
Largest incline ?? %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,3 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 5,6 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 500 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type LPA 
Cab manufacturer Leitner 
Cab model ?? 
Bubble colour ?? 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs 99 Stk
Cab distance 30 m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Redaelli 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 42 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way 3 m

miscellaneous data  
Transport uphill 100 %
Transport downhill 25 %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??  
Situation of entrance 90° 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 12/02/12
PHOTOS: ??

Lift-Statistics
9118 visit(s) since 23/10/10
Last visit 27/03/24

LIFT-WORLD IDs
Lift-ID: 14945
Place-ID: 1673

https://www.seilbahntechnik.net/en/lifts/14945/datas.htm