Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Falschbachbahn

Line
Line

Line
Line

Valley Station
Valley Station

General information  
Place Gerlos 
resort Snow Card Tirol 
Region Tyrol 
Country   
Name of lift Falschbachbahn 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2010 
Commissioning date 2010 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1868,6 m
Height of mountain station 2305,53 m
Vertical rise 436,93 m
Route distance 1250,00 m
Horizontal length 1165,00 m
Average incline 37,51 %
Largest incline ?? %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,20 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2800 Pers/h
Travel time 4,3 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer CWA 
Cab model OMEGA IV-8 LWI 
Seating leather 
Seat heater yes 
Heater ?? 
Aircon ?? 
Persons per cab
Number of cabs 51 Stk
Cab distance 61,00 m
Cab interval 10,3 s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 25 %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 5 months
Seasontime winter 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 01/01/24
PHOTOS: ??

Lift-Statistics
28057 visit(s) since 24/10/10
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 14944
Place-ID: 66

https://www.seilbahntechnik.net/en/lifts/14944/datas.htm