Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Unterschwarzachbahn










General information  
Place Hinterglemm 
resort Ski Alpin Card 
Region Salzburg 
Country   
Name of lift Unterschwarzachbahn 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2010 
Commissioning date 2010 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1060 m
Height of mountain station 1374 m
Vertical rise 314 m
Route distance 1000,55 m
Horizontal length ?? m
Average incline 33,05 %
Largest incline ?? %
Number of pillars 9 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,20 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2800 Pers/h
Travel time 2,92 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 457 kW
Drive power (Operation) 371 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer CWA 
Cab model OMEGA IV-8 LWI 
Seating leather 
Seat heater yes 
Heater no 
Aircon no 
Persons per cab
Number of cabs 42 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place mountain station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 47 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 5 months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Asset number (Trail map) A9 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 28/02/24
PHOTOS: ??

Lift-Statistics
17609 visit(s) since 30/09/10
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 14918
Place-ID: 343

https://www.seilbahntechnik.net/en/lifts/14918/datas.htm