Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  1-CLD Arosa - Hörnli



General information  
Place Arosa 
resort Lenzerheide-Arosa 
Region Grisons 
Country   
Name of lift Arosa - Hörnli 
Type 1-CLD 
Lift manufacturer Oehler 
Year of construction 1948 
Commissioning date ?? 
Date of closing down 1963 
Date of pull down ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
The only single person detachable chairlift

geometric data  
Height of valley station 1831 m
Height of middle station(s) ?? m
Height of mountain station 2494 m
Vertical rise 663 m
Route distance 2710 m
Horizontal length ?? m
Average incline ?? %
Largest incline 58,5 %
Number of pillars 51 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 100 Pers/h
Travel time ?? min
Driving speed line 2,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 80 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 20 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction ?? 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Situation of entrance ?? 
Situation of exit ?? 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 30/07/23
PHOTOS: ??

Lift-Statistics
6277 visit(s) since 31/01/10
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 14570
Place-ID: 68

https://www.seilbahntechnik.net/en/lifts/14570/datas.htm