Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-MGD Grindelwald-Holenstein

Line
Line

Line
Line

Valley station
Valley station

General information  
Place Grindelwald 
resort Jungfrau 
Region Berne 
Country   
Name of lift Grindelwald-Holenstein 
Type 4-MGD 
Lift manufacturer Habegger 
Year of construction 1978 
Commissioning date ?? 
Date of closing down 31/03/19 
Date of pull down 2019 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 942 m
Height of mountain station 1624 m
Vertical rise 682 m
Route distance 3167 m
Horizontal length ?? m
Average incline 21,64 %
Largest incline 55,15 %
Number of pillars 30 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 880 Pers/h
Travel time 15,3 min
Driving speed line 4,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 1400 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Gangloff 
Cab model ?? 
Seating carpet 
Seat heater no 
Heater ?? 
Aircon ?? 
Persons per cab
Number of cabs 230 Stk
Cab distance 60 m
Cab interval 15 s
Garage type ground floor 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 40 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 04/04/19
PHOTOS: ??

Lift-Statistics
25998 visit(s) since 24/11/02
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 1291
Place-ID: 1724

https://www.seilbahntechnik.net/en/lifts/1291/datas.htm