Lift-Database » Lifts in the world

  8-MGD SkiWeltbahn










General information  
Place Brixen im Thale 
resort ?? 
Region Tyrol 
Country   
Name of lift SkiWeltbahn 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2008 
Commissioning date 2008 


Infos for handicapped persons
Sorry, no information available.

Characteristics
This lift crosses a railtrack.
Grip force is checked at the top station.

geometric data  
Height of valley station 794 m
Height of mountain station 1820 m
Vertical rise 1007 m
Route distance 3407 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 21 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,20 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2200 Pers/h
Travel time 12 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 1200 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer CWA 
Cab model OMEGA IV-8 LWI 
Seating leather 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 96 Stk
Cab distance ?? m
Cab interval 13 s
Garage type ground floor 
Garage place valley station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Austria Draht 
Length of haul rope 7116 m
Total weight of haul rope 96 t
Haul rope diameter 56 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 4 months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) 11 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 28/02/24