
 |
Vote (Travelling comfort):  Count of votes: 0
Vote |
|
 |
|
Sorry, no information available.
|
|
|
|
| Place (skiresort) |
Hafling / Avelengo (Meran 2000) |
| Country |
I |
| Name of lift |
Piffing |
| Type |
3-CLF |
| Lift manufacturer |
Doppelmayr |
| Year of construction |
1991 |
|
|
| Height of valley station |
1893 m |
| Height of middle station(s) |
?? m |
| Height of mountain station |
2040,5 m |
| Vertical rise |
147,5 m |
| Route distance |
1459,94 m |
| Horizontal length |
?? m |
| Average incline |
?? % |
| Largest incline |
?? % |
| Number of pillars |
24 Stk |
| Track width |
?? m |
| Driving station |
Valley station |
| Tension station |
Mountain station |
| Tension type |
???? |
| Tension way |
?? m |
| Rope manufacturer |
?? |
| Length of rope |
?? m |
| Total weight of rope |
?? t |
| Rope diameter |
36 mm |
| Electrical engineering |
?? |
| Drive power (Start) |
?? kW |
| Drive power (Operation) |
?? kW |
| Brake power |
?? kW |
| Grip type |
???? |
| Chair manufacturer |
Doppelmayr |
| Chair model |
???? |
| Seat cover |
???? |
| Seat heater |
no |
| Number of chairs |
168 Stk |
| Persons per chair |
3 |
| Chair distance
|
?? m |
| Chair interval
|
?? s |
| Maximum capacity |
1550 Pers/h |
| Travel time |
8,0 min |
| Driving speed line |
2,5 m/s |
| Transport uphill |
100 % |
| Transport downhill |
?? % |
| Drive direction |
right
|
| Garage type |
none
|
| Garage place |
none
|
| Situation of entrance |
parallel |
| Situation of exit |
parallel |
| Loading carpet |
yes
|
| Construction period |
?? Months |
|
 |
| Replaced Leitner 2-CLF, no further data available |
|
|
| Updates |
Lift-Statistics |
| Datas 02/18/2008 22:18 |
263 visit(s) since 07/07/2004 |
| Photos ???? |
Last visit 10/10/2008 |
| |
|
Support Wrong data or something is missing? Support us! |
SourcesSource info of the datas. view >>>
|