|
| Height of valley station |
892 m |
| Height of middle station(s) |
?? m |
| Height of mountain station |
1393 m |
| Vertical rise |
501 m |
| Route distance |
1490 m |
| Horizontal length |
1391 m |
| Average incline |
36 % |
| Largest incline |
80 % |
| Number of pillars |
15 Stk |
| Track width |
?? m |
| Driving station |
Mountain station |
| Tension station |
Valley station |
| Tension type |
hydraulical (controlled) |
| Tension way |
?? m |
| Rope manufacturer |
Fatzer |
Length of rope (haul- or carrying- / traction rope) |
?? m |
Total weight of rope (haul- or carrying- / traction rope) |
?? t |
Rope diameter (haul- or carrying- / traction rope) |
40 mm |
| Electrical engineering |
Frey |
| Drive power (Start) |
506 kW |
| Drive power (Operation) |
337 kW |
| Brake power |
?? kW |
| Grip type |
???? |
| Cab manufacturer |
CWA |
| Cab model |
???? |
| Seat cover |
???? |
| Seat heater |
no |
| Number of cabs |
54/18 Stk |
| Persons per cab |
4/4 |
| Cab distance
|
?? m |
| Cab interval
|
?? s |
| Maximum capacity |
1200 Pers/h |
| Travel time |
6,29 min |
| Driving speed line |
3,90 m/s |
| Transport uphill |
100 % |
| Transport downhill |
?? % |
| Drive direction |
right
|
| Garage type |
ground floor
|
| Garage place |
Valley station
|
| Situation of entrance |
Double Loading System |
| Situation of exit |
Double Loading System |
| Loading carpet |
no
|
| Construction period |
?? Months |