Lift-World.info
Ropeway technology moves us!
de en fr cs nl  
Lift fulltext search:

Advanced search
Lift-World
Login
Login-Name:
Password:

Advertising
Lift-Database
Lift informations

Please klick to enlarge the it!
Valley station

Please klick to enlarge the it!
Line

Please klick to enlarge the it!
Mountain station

Show more photos...


 Votesystem:
 Vote (Travelling comfort): 
 Count of votes: 3

 Vote


Clips of this lift:2


  Infos for handicapped persons
Sorry, no information available.

 
 General information
 Place (skiresort) Fügen (Spieljoch)
 Country A
 Name of lift Spieljochbahn 1
 Type 4-MGD
 Lift manufacturer Girak
 Year of construction 1973

 Technical data
 Height of valley station 641 m
 Height of middle station(s) ?? m
 Height of mountain station 1198 m
 Vertical rise 557 m
 Route distance 2215 m
 Horizontal length ?? m
 Average incline 26,60 %
 Largest incline 61,30 %
 Number of pillars 18 Stk
 Track width ?? m
 Driving station Mountain station
 Tension station Valley station
 Tension type ????
 Tension way ?? m
 Rope manufacturer Teufelberger
 Length of rope ?? m
 Total weight of rope ?? t
 Rope diameter ?? mm
 Electrical engineering Siemens
 Drive power (Start) ?? kW
 Drive power (Operation) ?? kW
 Brake power ?? kW
 Grip type ????
 Cab manufacturer CWA
 Cab model ????
 Seat cover ???? 
 Seat heater no
 Number of cabs ?? Stk
 Persons per cab 4
 Cab distance ?? m
 Cab interval ?? s
 Maximum capacity 1500 Pers/h
 Travel time 7,7 min
 Driving speed line 4,8 m/s
 Transport uphill 100 %
 Transport downhill ?? %
 Drive direction ????
 Garage type ????
 Garage place ????
 Situation of entrance ???? 
 Situation of exit ???? 
 Construction period ?? Months

 Characteristics
nothing

 


 Comments
 
 10/27/2003 12:32
 Ram-Brand 
Yes, thats correct.

If the lift have two engines / two ropes then I put it as 2 lift in the database.


If the lift have one engine its one lift in the database only.

 10/18/2003 21:21
Hersteller: Girak
Electrotechnik und Antrieb: Siemens
Kabinen: CWA

Note: Spieljochbahn is not known as Spieljochbahn 1 and 2. It is known as one Spieljochbahn in two sections, The track has a slight curve at the mid-station. There are two independent track ropes, one for each section. Cabins must run trough the mid-station. They can not return at the same section in the mid-station.

Engines for the 1st section are located in the mid-station, Engines for the 2st section are located in the upper-station. Conventional (concrete) counterweights are located in the basement of the lower- and mid-station.


Write a comment:
 

You must be logged in to post messages!

 


Updates
Lift-Statistics
Datas 05/09/2005 21:54
1001 visit(s) since 08/28/2003
Photos 11/19/2006 21:46
Last visit 01/08/2009
 
Support
Wrong data or something is missing?
Support us!
Sources
Source info of the datas.
view >>>